Addendum to network connection requirements withdrawn
10 Dec 2015
Aurora has today withdrawn an Addendum to its Network Connection Requirements, which dealt with a temporary supply constraint in the Maungawera zone, affecting new connections in the Maungawera, Hawea Flat and Makarora areas.
The special control scheme required by the Addendum is no longer necessary.